皇冠体育寻求亚洲战略合作伙伴,皇冠代理招募中,皇冠平台开放会员注册、充值、提现、电脑版下载、APP下载。

首页社会正文

皇冠官方app(www.hg108.vip):KPower gets four-year PPA extension

admin2022-08-252

皇冠官方appwww.hg108.vip)是一个开放皇冠官方代理APP下载、皇冠官方会员APP下载、皇冠官方线路APP下载、皇冠官方登录APP下载的官方平台。皇冠体育官方APP上最新登录线路、新2皇冠官方网址更新最快。皇冠体育官方APP开放皇冠官方会员注册、皇冠官方代理开户等业务。

In a filing with Bursa Malaysia, KPower said the EC had vide its letter extended the final closing date from June 30 to Sept 30, 2022.

PETALING JAYA: KPower Bhd’s subsidiary – PKNP KPower Suria Sdn Bhd (PKSSB) – has obtained an extension from the Energy Commission (EC) for the development of a 50MW solar photovoltaic plant in Pahang.

In a filing with Bursa Malaysia, KPower said the EC had vide its letter extended the final closing date from June 30 to Sept 30, 2022.

,

皇冠官方appwww.hg108.vip)是一个开放皇冠官方代理APP下载、皇冠官方会员APP下载、皇冠官方线路APP下载、皇冠官方登录APP下载的官方平台。皇冠体育官方APP上最新登录线路、新2皇冠官方网址更新最快。皇冠体育官方APP开放皇冠官方会员注册、皇冠官方代理开户等业务。

,

KPower said the scheduled commercial operation date had been extended to Dec 31, 2023 from Sept 30, 2023 while the tenure of the power purchase agreement or PPA was from 21 years to 25 years.


转载说明:本文转载自Sunbet。

网友评论